Mercer
Asa Mercer International Middle School Replacement Project
Latest News
Live Video
Project Update: September 2024
- Entry curtain wall installed.
- Exterior sheathing installed and weather resistant barrier in progress.
- Completed installation of mechanical/electrical/plumbing in the administration wing.
- Installing masonry bricks on exterior.
![looking down a hill that has wood forms with rebar ready for concrete](http://caz0.storesoo.com/wp-content/uploads/2024/10/MIMS-SEP-2024-01-1024x768.jpg)
![a gray brick building with dirt around it](http://caz0.storesoo.com/wp-content/uploads/2024/10/MIMS-SEP-2024-02-1024x768.jpg)
![wall board taped and mudded with metal framing for a partial wall below a dropped ceiling](http://caz0.storesoo.com/wp-content/uploads/2024/10/MIMS-SEP-2024-06-1024x768.jpg)
![a two story glass wall exterior with holes for doorways covered in plastic](http://caz0.storesoo.com/wp-content/uploads/2024/10/MIMS-SEP-2024-03-1024x768.jpg)
![interior looking out through 2 story wall of windows with timber braces set in triangles](http://caz0.storesoo.com/wp-content/uploads/2024/10/MIMS-SEP-2024-05-1024x768.jpg)
(Updates are posted for the previous month after the BEX/BTA Oversight Committee Meeting. The committee does not meet in August so there is no July update.)
About the Project
The existing Asa Mercer Middle School building will be demolished and a new mass timber multi-story middle school building of approximately 174,000 sq. ft. constructed. Once complete, the new school building will provide permanent space for 1,000 students in grades 6–8.
The new one- to three-story school will be surrounded by landscaping and outdoor learning spaces. A synthetic turf practice field is planned for the east side of campus. A new, secure entry will welcome students, families, and the community with a clearly defined “front door” to the school.
Classrooms will be organized by academic neighborhoods, with flexible support spaces to promote a sense of community and support academic success for all students.
Sustainable design features are built in to meet district goals for clean energy and renewable resources.
Funding Source: Funded by the Building Excellence V (BEX V) Capital Levy, approved by Seattle voters in 2019.
Interim Location: During construction, Mercer International Middle School will be located at the Van Asselt School Interim Site, 7201 Beacon Ave. S.
Timeline
![construction phase graphic showing that the school is in the Construction phase](http://caz0.storesoo.com/wp-content/uploads/2022/08/ConstructionProgress_6_Construction-1024x124.png)
- Pre-design phase
- Schematic design phase
- Design development phase
- Construction documents/permitting phase
- Construction phase in progress
- School opens Fall 2025
Construction Progress Photos
Current Designs
This site plan below shows the planned layout for the campus and new school building. North is at the top of the image. The west boundary at 16th Avenue S. is to the left. S. Columbian Way is at the bottom.
![site plan for a large space with a building, trees, and parking](http://caz0.storesoo.com/wp-content/uploads/2024/05/Mercer-2023_0320_Color-Site-Plan-labeled-web-688x1024.jpg)
![drawing of the corner of a 3 story building with stairs leading to it](http://caz0.storesoo.com/wp-content/uploads/2024/05/Exterior_Update-web.jpg)
![drawing of a courtyard in the corner of two parts of a 2 story and 3 story building](http://caz0.storesoo.com/wp-content/uploads/2024/05/Courtyard_Update-web.jpg)
![a large open 2 story interior space looking down over learning stairs to the floor with lunchtables](http://caz0.storesoo.com/wp-content/uploads/2024/05/Commons-web.jpg)
![2 rooms with green walls have windows looking out to a common area with a pillar in it](http://caz0.storesoo.com/wp-content/uploads/2024/05/MMS-Learning-commons-Jan2024-web.png)
Project Team
Construction Management: Shiels Obletz Johnsen, Inc. (SOJ)
SOJ Construction Manager: Justine Kim, justinek@sojsea.com, 206-838-3706
School Design: Bassetti Architects
General Contractor: Cornerstone General Contractors
Project Address
1600 S. Columbian Way, Seattle, WA 98108